A featured selection from 120+ projects delivered and $188.3M+ in contract value — heritage restoration, social housing remediation, childcare, civil infrastructure and stormwater works delivered across Sydney and regional New South Wales for NSW Land and Housing Corporation, government agencies and council clients.

120+
Projects delivered
$188.3M+
Contract value delivered
National Trust Heritage Award winner
2014
Year established
Contract value
$6.25M
44 weeks · 8 ahead
Social Housing Remedial LAHC Multi-Site

Bar Beach — window & door programme + remediation.

Major remedial building works, window and door replacement, structural remediation, waterproofing upgrades and internal refurbishment works across three occupied residential addresses for NSW Land and Housing Corporation: 1–15 Light Street, 4–16 Nickson Street and 15–17 Greenslopes Street, Bar Beach.

As experienced remedial building contractors and façade restoration specialists, We Build Australia implemented comprehensive tenant coordination, water-ingress repairs, quality-assurance systems and live-environment construction methodologies — delivering the project eight weeks ahead of the 52-week tender date.

Project
Window & Door Replacement + Remediation
Client
NSW Land and Housing Corporation
Sites
3 addresses, Bar Beach NSW
Value
$6.25 million
Duration
44 weeks
Performance
8 weeks ahead of tender

Key delivery highlights

  • Two-stage execution across three occupied LAHC residential addresses
  • Comprehensive tenant coordination, traffic & pedestrian management
  • Active risk management for water ingress, programming and tenant disturbance
  • Stringent QA via ITPs and Quality Management System
  • Engineer remediation works integrated within the window & door programme
  • Delivered eight weeks ahead of the tender completion date
Bar Beach — scaffolded LAHC residential building with blue protective sheeting during the window and door replacement programme
Scaffolded façade · works in progress
Bar Beach — side elevation of the scaffolded brick LAHC building during remedial works and window replacement
Side elevation · live environment
Bar Beach — We Build Australia site team in branded high-vis vests during a safety briefing beside scaffolded LAHC building
Site team · safety briefing
Contract value
$5.25M
62-week programme
Social Housing LAHC Multi-Trade Live Environment

Waterloo — occupied public housing upgrade.

A large-scale NSW Land and Housing Corporation project involving landscaping upgrades, stormwater infrastructure, roofing upgrades, façade restoration, rear-lane upgrades and communal infrastructure improvements across multiple occupied residential buildings in inner Sydney.

The 62-week programme demonstrates We Build Australia's capability as public housing construction contractors and live-environment specialists — coordinating multi-trade upgrade works while tenants remained in residence and external public realm remained operational.

Project
Public Housing Upgrade — Multi-Trade
Client
NSW Land and Housing Corporation
Location
Walker Street, Waterloo NSW
Value
$5.25 million
Duration
62 weeks
Scope
Landscaping, stormwater, roofing, façade

Key delivery scope

  • Landscaping upgrades across communal areas and public realm
  • Stormwater infrastructure renewal and drainage rectification
  • Roofing upgrades across multiple occupied residential buildings
  • Façade restoration including remedial concrete and weatherproofing
  • Rear-lane upgrades — paving, lighting, waste-management coordination
  • Communal infrastructure improvements with tenant-coordinated staging
Before
Walker Street, Waterloo — BEFORE: weathered LAHC residential block with peeling paint balustrades and aged frontage prior to upgrade Walker Street, Waterloo — BEFORE: dilapidated waste-room enclosure with sheet-metal gates and curved tin awning prior to rebuild Walker Street, Waterloo — BEFORE: poor-condition rear-lane waste enclosure prior to communal infrastructure upgrade
After
Walker Street, Waterloo — AFTER: restored two-storey LAHC residential terrace with new balustrades, fresh paint and reinstated ground works Walker Street, Waterloo — AFTER: new garage roller-door waste enclosure with brick pillars and clean concrete pavement Walker Street, Waterloo — AFTER: completed new waste room with roller door, brick gate post and refreshed rear-lane infrastructure
Contract value
$4.46M
44-week programme
Education Childcare Commercial Accessibility

Merrylands — a centre for children.

A purpose-built childcare construction project in Merrylands NSW, showcasing our expertise as a leading NSW construction company specialising in commercial construction services, education facilities, accessibility-compliant construction and live-environment project delivery.

The centre incorporates modern learning environments, outdoor play areas, sustainable construction methods, security systems and child-safe infrastructure — demonstrating our capability in government-style construction delivery, quality building management and large-scale community infrastructure projects.

Project
Purpose-Built Childcare Centre
Client
Advanced Childcare / Advanced Early Learning
Location
Merrylands NSW
Value
$4.46 million
Duration
44 weeks
Sector
Education / Childcare

Key delivery scope

  • Modern learning environments across infant, toddler and preschool zones
  • Outdoor play areas with age-specific surface and shade design
  • Sustainable construction methods and energy-efficient systems
  • Security systems, controlled access, surveillance and child-safe fencing
  • Full childcare licensing, health and accessibility-compliance fit-out
  • Comprehensive handover, management training and as-built documentation
Advanced Childcare Merrylands — completed purpose-built childcare centre with multi-coloured façade panels, green shade sail, accessible ramp and pencil-themed boundary fencing
Advanced Childcare Merrylands · front elevation
Contract value
$3.88M
40 weeks · 4 ahead
National Trust Heritage Award Heritage LAHC Government

Pyrmont — heritage conservation.

Building envelope repair, drainage and landscaping works at 10–18 Point Street, Pyrmont. Delivered for NSW Land and Housing Corporation in partnership with The Project Studio, Long Blackledge Architects, Sym Studio and Erbas — within a sensitive heritage environment requiring exacting conservation methods.

Completed four weeks ahead of programme and awarded the National Trust Heritage Award for Conservation — Built Heritage. The project is a benchmark for live-environment heritage restoration delivery in NSW.

Project
Heritage Building Upgrade
Client
NSW Land and Housing Corporation
Address
10–18 Point Street, Pyrmont
Value
$3.88 million
Duration
40 weeks (4 weeks ahead)
Recognition
National Trust Heritage Award

Key delivery highlights

  • Stringent site-access control with chain-wire and shade-cloth hoarding
  • Robust traffic & pedestrian management plan maintaining tenant access
  • Phased internal window & door repairs prioritising tenant satisfaction
  • Heritage-sensitive drainage works with sediment control
  • Landscaping including asphalt demolition, excavation and new pavement
  • Delivered four weeks ahead of the proposed programme
Ways Terrace, Pyrmont — completed heritage terrace as seen from the Sydney Harbour foreshore at Pyrmont after restoration
Completed heritage terrace · harbour outlook
Ways Terrace, Pyrmont — scaffolded heritage building with We Build Australia branded site hoarding mid-construction
Scaffolded heritage works · in progress
Ways Terrace, Pyrmont — We Build Australia and partner team group photo on the grass terrace at completion
Project team · Heritage Award
Read full case study
Contract value
$3.25M
24-week programme
Civil & Infrastructure Subdivision 11 Lots On Programme & Budget

Austral — 11-lot subdivision & civil infrastructure.

Comprehensive subdivision and civil infrastructure works at 15 Twenty-eight Avenue, Austral. The scope encompassed land subdivision into 11 distinct lots, full water infrastructure, road construction, sewerage system, high-voltage electrical works and significant earthworks — delivered as a single end-to-end infrastructure-contractor package.

Completed within the stipulated 24-week timeframe and within budget — delivering a high-quality residential subdivision ready for market and demonstrating our capability to manage and deliver complex civil infrastructure projects efficiently across roads, hydraulics, sewer, electrical and earthworks scopes.

Project
Subdivision of 11 Residential Lots
Client
Australia Holdings Pty Ltd
Address
15 Twenty-eight Avenue, Austral
Value
$3.25 million
Duration
24 weeks
Scope
Civil & infrastructure

Key activities

  • Land subdivision into 11 distinct lots with full regulatory compliance
  • Water infrastructure including mains, hydrants and municipal connections
  • Road construction — base preparation, asphalt paving, kerb & gutter
  • Comprehensive sewerage system including manholes and network connections
  • High-voltage electrical works with transformers and switchgear
  • Site-wide cut & fill earthworks with stormwater management
  • Delivered on programme and within budget
28th Avenue Austral — civil works in progress with We Build Australia excavator, tracked loader and earthworks on subdivision site
28th Avenue Austral — graded and prepared lots with services infrastructure during the subdivision construction programme
28th Avenue Austral — completed subdivision streetscape with finished roads, kerb, footpath and signage ready for market
Contract value
$2.55M
22-week programme
Civil & Stormwater Council Environmental

Kincumber — stormwater & sewer in flood-affected zones.

Complex stormwater infrastructure and sewer management works delivered within environmentally sensitive, flood-affected council catchment zones on the NSW Central Coast. Works included sandstone retaining wall construction, hydraulic infrastructure upgrades, landscaping improvements and environmental management controls.

The project demonstrates We Build Australia's expertise as civil infrastructure contractors specialising in stormwater management, structural retaining systems and government construction delivery in constrained, environmentally sensitive locations.

Project
Stormwater & Sewer Civil Works
Sector
Civil & Infrastructure / Council
Location
Kincumber, NSW Central Coast
Value
$2.55 million
Duration
22 weeks
Scope
Stormwater, retaining, hydraulics

Key delivery scope

  • Stormwater infrastructure design coordination and installation
  • Sewer management works in flood-affected catchment zones
  • Sandstone retaining wall construction — heritage-style structural retaining
  • Hydraulic infrastructure upgrades across the catchment
  • Landscaping improvements integrated with environmental controls
  • Sediment, erosion and water-quality management throughout works
Kincumber — completed concrete stormwater outfall structure discharging to creek through grassed embankment in flood-affected catchment zone
Stormwater outfall · creek catchment
Kincumber — completed sandstone retaining wall and pedestrian path between residential properties on the Central Coast
Sandstone retaining wall
Kincumber — We Build Australia site team in branded high-vis discussing newly poured concrete drainage works
Site team · drainage works
Contract value
$1.9M
32-week programme
Civil & Stormwater Accessibility Live Environment

Marks Point — culvert stabilisation & civil upgrade.

A technically complex civil infrastructure project involving culvert stabilisation, stormwater infrastructure upgrades, accessibility improvements, landscaping construction, structural stabilisation works and community infrastructure upgrades within constrained service corridors on the NSW Central Coast.

Delivered through staged construction methodologies, the project demonstrates expertise in civil infrastructure construction, public housing-adjacent upgrades and accessibility-compliant building works in live, occupied environments.

Project
Culvert & Civil Infrastructure Upgrade
Sector
Civil & Infrastructure
Location
Marks Point, NSW
Value
$1.9 million
Duration
32 weeks
Scope
Culvert, stormwater, accessibility

Key delivery scope

  • Culvert stabilisation across constrained service corridors
  • Stormwater infrastructure upgrades and re-routing
  • Accessibility improvements compliant with current standards
  • Landscaping construction integrated with civil works
  • Structural stabilisation across community infrastructure
  • Staged construction methodology in a live, occupied environment
Marks Point — completed brick-paver driveway with new landscaping and concrete kerb at single-storey LAHC residential complex
New driveway · landscaping complete
Marks Point — completed paver-block driveway and upgraded landscaping between residential blocks
Paver driveway · residential complex
Marks Point — new brick paver driveway with garden bed planting and concrete kerb between residential blocks
Paving & planting · public realm
Marks Point — refreshed accessible pathway between LAHC residential blocks with garden bed and safety bollard
Accessible pathway · safety bollards
Marks Point — new accessibility-compliant pathway with safety bollards and concrete edging between residential blocks
Accessibility-compliant path
Contract value
$1.9M
44-week programme
Remedial Façade Waterproofing Live Environment

South Coogee — remedial building & façade remediation.

Comprehensive remedial building works including concrete spalling repairs, balustrade replacement, structural remediation, building envelope repairs, waterproofing rectification and water-ingress repairs within occupied residential apartment buildings on Sydney's eastern coast.

As experienced remedial building contractors and façade remediation specialists, We Build Australia delivered long-term structural protection, improved safety compliance and high-quality remedial outcomes within a live residential environment over a 44-week programme.

Project
Remedial Building & Façade Works
Sector
Remedial / Residential
Location
South Coogee, NSW
Value
$1.9 million
Duration
44 weeks
Scope
Concrete spalling, façade, waterproofing

Key delivery scope

  • Concrete spalling repairs across building façades and balconies
  • Balustrade replacement compliant with current safety standards
  • Structural remediation of reinforced concrete elements
  • Building envelope repairs and weatherproofing
  • Waterproofing rectification across wet areas and external transitions
  • Water-ingress repairs delivered without disturbing residents
South Coogee — five-storey residential apartment building with balconies and security fencing where remedial concrete spalling repairs were delivered
Residential block · remedial works
South Coogee — 21 Gregory Street residential apartment building elevation showing balconies before remedial façade works
21 Gregory Street · balcony works
South Coogee — 19 Gregory Street brick mid-rise apartment building with balconies prior to concrete spalling repair and waterproofing rectification
19 Gregory Street · brick mid-rise
Contract value
$1.25M
18-week programme
Civil & Landscaping Accessibility Live Environment

Kelso — civil infrastructure & landscaping.

A civil infrastructure and landscaping construction project at Culnane Place, Kelso, involving demolition, drainage upgrades, paving, retaining walls, accessibility improvements, hydraulic infrastructure works, fencing installation and public-domain landscaping upgrades within an occupied residential environment.

The project demonstrates We Build Australia's capability in stormwater infrastructure construction, accessibility upgrade works, civil construction services and complex live-environment project delivery in regional NSW.

Project
Civil & Landscaping Upgrade
Sector
Civil / Public Realm
Location
Culnane Place, Kelso NSW
Value
$1.25 million
Duration
18 weeks
Scope
Drainage, paving, accessibility, landscaping

Key delivery scope

  • Demolition of existing infrastructure with waste-stream management
  • Drainage upgrades — stormwater pits, lines and outfalls
  • Paving, retaining walls and accessibility-compliant pathways
  • Hydraulic infrastructure works integrated with civil scope
  • Fencing installation across the public-domain interface
  • Public-domain landscaping within an occupied residential environment
Kelso — Culnane Place: newly poured concrete pathway under construction with safety fencing, bollards and accessibility-compliant edging
New concrete pathway · pour complete
Kelso — Culnane Place: We Build Australia tradesmen working on fresh concrete formwork during civil and landscaping upgrade
Concrete formwork · live environment
— Full project documentation available on request

Want our full capability statement?

Detailed project documentation including financial standing, insurance schedules, key personnel CVs, methodology statements and project-specific photography is available to tender evaluators and procurement panels on request.